Culvert renewal works are planned to start in August with construction expected to take about eight to 16 weeks, site conditions and weather permitting. A temporary side-track will be in place around these works.
This project is included in our 2025/26 Capital Works program and will be delivered by Council’s road crew. - Commencing
- 1 August 2025
- Completion
- 30 November 2025
-
The existing culvert has been identified for replacement, with this project aiming to provide a safer culvert structure, future-protecting this asset against erosion and environmental damage and reducing the frequency of future maintenance.
What to expect
Please be mindful when driving through this location that there will soon be work crews and heavy machinery on site.
When the single lane side-track is established, detour signage and traffic control will be installed while culvert renewal works are carried out.
No disruptions to property access is expected.
- Works Monday to Friday, 7am-5pm, weather permitting.
- Noise, vibration and dust from the work area is expected.
- Heavy machinery and equipment operating.
- Traffic management at times, including traffic disruptions and delays.
- Please follow directions and signage in the area.
The Dalga Road Culvert Renewal project is proudly supported by Transport Infrastructure Development Scheme (TIDS) 2025/26 funding and Gladstone Regional Council.Please use this information as a guide only. Due to the nature of construction projects and unforeseen delays, works may vary.