- Location
- Monterey Way, Calliope
- Description of Works
- Works will be undertaken to upgrade the current chemical dosing unit on site to improve corrosion control and reduce sewer odour.
- Commencing
- 13 May 2025
- Completion
- Mid-July 2025
- More information
-
Civil and electrical works will be required to replace the existing temporary unit and install a permanent chemical dosing unit.
This project aims to provide improved infrastructure, reducing the need for on-going maintenance while reducing the risk of unplanned sewer disruptions for residents.
These works are included in Council’s Capital Works program.
Above dates are a guide only. Due to the nature of construction projects and unforeseen delays, works may vary.
What to expect
- Works from Monday to Friday, 7am-4.30pm, weather permitting.
- Machinery operating.
- Concrete slab demolition, removal and construction.
- Noise, vibration, odour and dust can be expected from the project site.
- At times, some additional traffic in the area and pedestrian disruptions.
- No interruption to sewer services is expected.
If near the area, please be mindful of works and follow signs and directions.