- Location
- Mingara Crescent, Calliope
- Description of Works
-
• Council proposes to renew the Silverdale Reservoir which is a critical infrastructure asset with a capacity of 2.2ML.
• The reservoir supplies potable water to 403 properties in the township of Calliope, supplying drinking water to residential, community and business assets within the Silverdale Reservoir Catchment. - Commencing
- 8 January 2024
- Completion
- 10 May 2024
- More information
-
Works will include:
- Construction of a set of aluminium stairs and landings to access the top of the reservoir safely
- Strengthening the existing aluminium columns supporting the reservoir roof with a proprietary system
- Lightning protection
- Replace scour grate and overflow pipeline
- Security measures (for example fencing and locking systems)
- Measures to increase the integrity of the reservoir such as wall sealing, concrete and joint repairs
- Replace isolation and control valves and internal pipework
The Silverdale Reservoir Renewal project is proudly funded by the Queensland Government’s Building our Regions program.